References

Support and empowerment.

Your success is our success

Support and empowerment.

We advise and accompany our customers on the path to becoming a Lean Enterprise. And we empower you to continue on this path on your own.

 

The following examples give an idea of how this path works.

An overview of our references

BERNINA INTERNATIONAL AG

Massive reduction in throughput and assembly times

Wertfabrik supported us to change our final assembly to One Piece Flow in 2012.

MANUFACTURING EQUIPMENT & SYSTEMS

EBM II

“Shortcut” Photovoltaic System throughput time reduced by over 90%

Thanks to the Lean Administration Programme “WERT-VOLL” EBM achieved massive improvements immediately after implementation.

ENERGY, SERVICES

GDELS-MOWAG GMBH

Factory planning fit for the future

GDELS-Mowag GmbH gave Wertfabrik the task of planning their future factory layout for mechanical production as part of a relocation. The result was a reduction of up to 90% in transport distances.

OTHERS

KABA AG

“Lean” for Kaba – Successful One-to-One-Coaching

Performance improvements in double digit percentages was one of the results Kaba AG achieved with Wertfabrik.

ELECTRONICS, ELECTRO TECHNOLOGY, SENSORS

METTLER-TOLEDO AG

With SFM full on course to achieve our vision

Thanks to an optimal Shop floor Management Systems Mettler-Toledo AG has improved leadership performance and avoided micro management.

ELECTRONICS, ELECTRO TECHNOLOGY, SENSORS

SCHLEUNIGER AG

More productivity with Shop floor-Management

With the implementation of Shop floor Management Systems Schleuniger AG increased productivity by 17% in ten weeks.

MANUFACTURING EQUIPMENT & SYSTEMS

BLASER METALLBAU AG

Blaser Metallbau is quicker

Thanks to Lean methods Blaser Metallbau AG eliminated unnecessary searching and increased the proportion of value adding activities.

METAL WORKING

EICHENBERGER GEWINDE AG

Assembly Process Optimisation

Wertfabrik supported Eichenberger Gewinde AG over a four month period to install two production cells.

MANUFACTURING EQUIPMENT & SYSTEMS, METAL WORKING

GEORG HAAG AG

A flow production to counteract the strength of the Swiss Franc

Wertfabrik supported Georg Haag AG to introduce a flow production, which achieve reductions in inventory and throughput time of up to 70%.

METAL WORKING

KISTLER AUTOMOTIVE GMBH

Ergonomic work stations for a new Lean factory in Sindelfingen

Thanks to optimal standard work stations Kistler Automotive GmbH employees are highly motivated to achieve top performance after relocating.

ELECTRONICS, ELECTRO TECHNOLOGY, SENSORS

NOVA WERKE AG

Lead time reductions due to levelling and adoption of the Pull principle

Due to the Pull principle and Kanban Nova Werke AG in Germany reduced their lead time from 22 to 5 days and simplified planning.

MANUFACTURING EQUIPMENT & SYSTEMS

EBM I

Lean connection to the grid

Thank to Lean Management EBM massively reduced throughput time in 2015.

ENERGY, SERVICES

FERRUM AG

ferruLean – Flow product for canning equipment

Ferrum AG was able to reduce the throughput time to 30 days and increase productivity by 30% with the project ferruLean supported by Wertfabrik.

MANUFACTURING EQUIPMENT & SYSTEMS

HÄRTEREI GERSTER AG

Flexibility increased through shorter lead times

Härterei Gerster AG completed three Lean projects over a fifteen month period with Wertfabrik and achieved impressive results.

METAL WORKING

KISTLER INSTRUMENTS AG

Significantly lower lead times

The new production system Speedup is convincing with flexibility and high reactivity is relation to customer volume demands.

ELECTRONICS, ELECTRO TECHNOLOGY, SENSORS

SCHEKOLIN AG

Order processing in two and a half hours

With process optimisation Wertfabrik was able to reduce the throughput time between order intake and printing at Shekolin AG by over 90%.

OTHERS